Podium Construction Programme MS Project

Бюджет
до 40 839 ₽
Опубликован
Откликов
22

ИИ поможет частично

ИИ ускорит отдельные шаги, а основное придётся делать руками и опытом. Оценка сделана по тексту заказа и его разделу.

Что пишет заказчик

Experienced Construction Planner Required – Full Podium Construction Programme (MS Project)

I am looking for an experienced construction planner or project engineer to develop a comprehensive construction programme for the entirety of the podium works on an ongoing commercial construction project in Australia.

The project consists of two multi-storey commercial buildings (C3 and C4), with podium works surrounding and connecting both buildings. C4 is currently progressing ahead of C3, which must be considered when developing the construction sequence.

Scope of Work:

Develop a full, detailed podium construction programme from commencement through to completion.

Review the master target programme, current construction programme, architectural drawings and site progress photographs.

Independently identify all activities required to complete the podium works.

Break down the programme into logical construction zones and work fronts.

Determine realistic commencement dates, activity durations and completion dates.

Consider scaffolding removal, access restrictions, logistics and interfaces with both buildings.

Identify opportunities to commence podium works earlier and undertake activities concurrently where practical.

Incorporate all relevant civil, structural, waterproofing, services, drainage, external finishes, paving and landscaping works.

Establish logical predecessors, successors and construction dependencies.

Ensure the podium programme aligns with the master target programme and actual site progress.

Replicate the formatting and structure of an existing basement construction programme that will be provided as a reference.

Exclude unrelated building activities and unnecessary handover milestones.

Documentation Provided:

Master target construction programme.

Current construction lookahead programme.

Existing basement construction programme as a template.

Architectural and relevant construction drawings.

Current site progress photographs.

Information regarding completed and ongoing works.

Deliverable:

One comprehensive, fully editable Microsoft Project (.mpp) file, including:

Detailed work breakdown structure.

Construction activities separated by zone where appropriate.

Realistic activity durations.

Start and finish dates.

Predecessors and successors.

Logical construction sequencing.

Professionally formatted Gantt chart.

Required Experience:

Advanced Microsoft Project proficiency.

Commercial construction planning and programming experience.

Strong understanding of construction methodology and sequencing.

Experience with podium and external construction works.

Ability to independently review and interpret construction drawings.

Australian construction industry experience is highly preferred.

I require someone who can independently develop a complete and practical construction programme, rather than simply populate Microsoft Project with generic activities. The programme will be used to manage and coordinate actual construction works on site.

This is an urgent requirement. Please provide examples of previous construction programmes, relevant experience, proposed fee and earliest available turnaround time.

All project documentation must remain strictly confidential.

Как сделать с нейросетью

Чем делать

  • Языковая модель - документы, таблицы, анализ, бизнес-планы
  • Таблицы - расчёты, которые можно проверить
  • Профильный специалист - налоги, право, стройка

По шагам

  1. Отдели, что можно сделать с ИИ (документы, анализ), а где нужна квалификация
  2. Сделай черновик и проверь каждую цифру
  3. В налогах, праве и стройке без опыта не берись
  4. Сдай с понятными источниками и допущениями

Подробно про такие заказы - на странице «Бизнес-задачи».

Промпт для старта

Вставьте в Claude Code, Codex или чат с нейросетью - агент сначала задаст вопросы и предложит план, а не начнёт гадать.

Ты - бизнес-аналитик и помощник предпринимателя. Помоги выполнить заказ с фриланс-биржи.

Заказ: «Podium Construction Programme MS Project»
Бюджет: до 40 839 ₽
Что пишет заказчик:
Experienced Construction Planner Required – Full Podium Construction Programme (MS Project)

I am looking for an experienced construction planner or project engineer to develop a comprehensive construction programme for the entirety of the podium works on an ongoing commercial construction project in Australia.

The project consists of two multi-storey commercial buildings (C3 and C4), with podium works surrounding and connecting both buildings. C4 is currently progressing ahead of C3, which must be considered when developing the construction sequence.

Scope of Work:

Develop a full, detailed podium construction programme from commencement through to completion.

Review the master target programme, current construction programme, architectural drawings and site progress photographs.

Independently identify all activities required to complete the podium works.

Break down the programme into logical construction zones and work fronts.

Determine realistic commencement dates, activity durations and completion dates.

Consider scaffolding removal, access restrictions, logistics and interfaces with both buildings.

Identify opportunities to commence podium works earlier and undertake activities concurrently where practical.

Incorporate all relevant civil, structural, waterproofing, services, drainage, external finishes, paving and landscaping works.

Establish logical predecessors, successors and construction dependencies.

Ensure the podium programme aligns with the master targ

Сначала задай мне уточняющие вопросы, без которых работу не сделать (не больше 7). Потом предложи план по шагам и список того, что нужно получить от заказчика: доступы, материалы, примеры. Не начинай делать, пока я не подтвержу план.

Делайте заказы сразу несколькими ИИ-агентами

VibeeCode - Среда Мультиагентной Разработки: Claude Code, Codex и другие агенты над одним проектом, встроенный браузер, чтобы проверить сайт или бота, и голосовой ввод.

Посмотреть VibeeCode

Похожие заказы

  • до 61 705 ₽ИИ сильно поможет

    US Sales Rep: Sell AI Visibility to Local Businesses (25% Recurring Commission + Base)

    Summary When a local business owner asks ChatGPT "who's the best dentist near me?", many businesses don't show up at all, and they don't even know it. We fix that. BlackCat Marketing is a US-based agency that h…

    1 откликзарубежный
  • по договорённостиИИ поможет частично

    Разработка моющих средств

    Разовая задача или временный проект · Консультация, разработка рецептуры, разработка технических условий (ТУ), подбор оборудования и сырья, химический анализ · Пожелания и особенности: Нужно разработать моющие…

  • 5 000 ₽ИИ поможет частично

    Воронка продаж в нельзяграм

    Рекламодатель: физическое лицо · Разовая задача или временный проект · Логопедия · Пожелания и особенности: Необходимо разработать воронку из инсты в бот сейл . Связка чат плейс бот сейл . Нужен человек понимаю…

  • до 14 441 ₽ИИ поможет частично

    Corporate Dispute Legal Action

    I need a legal expert to handle a dispute between owners/shareholders in a corporation. The main issue is around protecting my ownership rights, specifically regarding my share of company profits and assets. Ke…

    5 откликовзарубежный
  • по договорённостиИИ поможет частично

    Обучение созданию нейросетей

    Для себя · Обучение

  • до 2 468 ₽ИИ поможет частично

    Drive 10 Daily Lingerie Sales

    My online store specialises in lingerie, with costumes and everyday clothing as secondary lines, and I’m ready to scale sales through Google Ads. The immediate target is simple and measurable: at least ten comp…

    11 откликовзарубежный